Meter Pole 200 Amp CenterPoint
200A Meter Pole Requirements – CenterPoint Energy
- Pressure-treated wood post: 4×6, 6×6, or minimum 4” round post.
- Minimum 4 ft. buried depth.
- Meter center: 4–6 ft. above finished grade.
- Approved meter socket, permanently marked with the service address.
- Weatherhead and service conductors installed according to CenterPoint specifications.
- Properly installed conduit and straps.
- Ground rod and grounding system installed correctly.
- Main disconnect/breaker accessible for inspection.
- Installation must comply with CenterPoint Energy Electric Service Standards.
Add comment
Comments
Your map shows a couple of locationa in SC. Do you service Clemson, SC?
I need a power pole set at my mother's house just outside of Clemson.
Hi Meter Pole Solution,
I’ve built and trained an AI employee specifically for Meter Pole Solution.
I trained it on 6+ hours worth of your data and it can help capture leads, remove bad reviews, answer the phone after hours, handle texts and emails — just like a team member would.
This isn’t a sales call. It’s a 20-minute demo where you can actually interact with the AI employee and see what it can do.
On average, our agents help increase leads by 17% and save our customers 21 hours per week.
Would today or tomorrow work for a quick walkthrough?
Schedule a time on my calendar to meet the agent I trained for you and see what she can do here: getdandy.com/ai-agent-intro or call me at (949) 590-9895.
Talk soon,
Jennifer O'Brien | Senior Growth Advisor
Getdandy
getdandy.com/ai-agent-intro/